Api rp 1110

Alexa Actionable Analytics for the Web. Records of pressure tests are to be maintained by the operator to comply with the requirements of ASME B The volume or pressure of any added or subtracted test medium should be documented on the deadweight log, as well as the temperature and pressure at that time and be accounted for in the assessment of the results of the pressure test. For test sections containing more than one type of pipe, the maximum test pressure at low point and minimum test pressure at high point and resulting SMYS need to be calculated for each type of pipe. A drawing of any facility piping tested and the limits of the test.

Uploader: Kigazilkree
Date Added: 27 December 2017
File Size: 30.47 Mb
Operating Systems: Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X
Downloads: 80190
Price: Free* [*Free Regsitration Required]





The following equipment may be necessary to complete this process: Your consent to our cookies if you continue to use this website. Note that pressure charts, sensors, and displays only show an approximation of the actual pressure. These standards are not intended to obviate the need for applying sound engineering judgment regarding when and where these standards should be utilized.

This recommended practice suggests procedures that are based on sound engineering judgment, but certain governmental requirements may differ apu the procedures set forth in this recommended practice.

To meet these responsibilities, API members pledge to manage apk businesses according to the following principles using sound science to prioritize risks and to implement cost-effective management practices: Amazon Music Apu millions of songs.

Suitable contingency response equipment and personnel for spill cleanup are strategically placed near the pipeline or piping segment to be tested. These test records should be signed by the responsible parties and retained for the life of the facility or until new test records supersede them.

Station Difference in elevation from tester: Test pressure should be as follows: The pipeline or piping segment to be tested is not part of an offshore pipeline or offshore piping facility. A deadweight tester4 or an equivalent pressure sensing device that is capable of measuring in increments of less than or equal to one 1 pound per square inch 6. The pipeline or piping segment to be tested is kept under regular surveillance by pipeline personnel equipped with portable radios or similar equipment to provide continuous communication with the person in charge.

The temperature of the buried line should be recorded until the pressure test is completed.

API RP 1110 Pressure Testing of Liquid Petroleum Pipelines

The formulation and publication of API standards appi not intended in any way to inhibit anyone from using any other practices. If freeze plugs are used to isolate line segments, 11110 handling techniques should be used to ensure personnel safety. Withoutabox Submit to Film Festivals. The record Ep American Petroleum Institute Reproduced by IHS under license with API No reproduction or networking permitted without license from IHS should indicate the exact location of each failure, describe the type of failure and its cause, and describe the method of repair.

This recommended practice recommends procedures to be followed, suggests equipment to be used, and points out factors to be considered during the pressure testing. This information aids in determining the tightness of the segment and assists in determining, along with the P-V plot, if leaks have occurred or if the pipe has yielded.

Shopbop Designer Fashion Brands.

API RP pressure testing_百度文库

Insulate, if appropriate, the capillary lines to the temperature recorder, and install the recorder in an insulated box. If internal inspection tools surveys were conducted, the data should be carefully reviewed.

Equipment that isolates line segments for leak determination and facilitates repair. Test procedures meet all applicable local, state, or federal government regulations. Share your thoughts with other customers.

Tests should normally be planned so that anywhere in the test segment the pressure level does not produce hoop stress near or above the SMYS. This will aid in the determination of line stability.

The test period should 1110 after the injection pump has been stopped, and the system has stabilized. Pressurization of the section should occur at a controlled apl to avoid surging the line. Time Pressure psig Date Date Pipe temp. Installation of underground petroleum storage tank.

A diagram indicating the lengths, elevations, and locations of the test segments, including any tested piping manifolds, and set-up of test equipment. The maximum operating pressure anticipated for the life of the facility.

About the Author: Kazralar

1 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *